Logo
R12.1-2025July30

Build Base Table with Data from Other Table

An existing ADT can be directly used to create a new ADT via Merged ADT, Subset of ADT. Moreover, if you have a CSV containing useful data, the CSV data can be imported to NetBrain system to be used for creating ADT. 
  • Build Base Table with Merged ADT
  • Build Base Table with Subset of ADT
  • Build Base Table with Imported CSV
Build Base Table via Member Intents of Intent Cluster Build Base Table with Merged ADT